Contact Information

Illinois

108 Gateway Road, Bensenville, IL 60106
Telephone: (630) 766-7900
Fax: (630) 766-7937

Wisconsin

7528 Pershing Blvd., Suite B300, Kenosha, WI 53142
Telephone: (800) 323-8162
Fax: (630) 766-7937

Electronic mail:

Sales: sales@airservicesco.com
Webmaster: webmaster@airservicesco.com

Useful Data

Breakdown of Compressed Air Costs over 10 Years

Compressor system 10 year cost breakdown

Breakdown of Typical Plant Air Consumption

Air system load breakdown

Compressor Control Comparison

% Of Full Load BHP Versus % Of Full Load Capacity

% of

Compressor

Capacity

Modulation

(Inlet Valve)

% FL BHP

Variable Displacement

(Geometry)

% FL BHP

On-Line / Off-Line

 

Variable Speed Drive

1 Gal/CFM

3 Gal/CFM

5 Gal/CFM

% FL BHP

% FL BHP

% FL BHP

% FL BHP

100

100.00

100.00

100.00

100.00

100.00

100.00

95

98.50

96.00

101.51

100.49

99.95

95.20

90

97.00

92.00

100.44

98.36

97.28

90.40

85

95.50

88.20

99.28

96.11

94.51

85.60

80

94.00

84.70

98.02

93.71

91.61

80.80

75

92.50

81.50

96.64

91.17

88.59

76.00

70

91.00

78.30

95.12

88.46

85.43

71.20

65

89.50

75.40

93.45

85.57

82.10

66.40

60

88.00

73.00

91.58

82.49

78.63

61.60

55

86.50

70.80

89.49

79.19

75.02

56.80

50

85.00

69.00

87.13

75.67

71.25

52.00

45

83.50

64.60

84.44

71.89

67.34

47.20

40

82.00

60.20

81.35

67.80

63.28

42.40

35

80.50

55.80

77.76

63.41

59.06

37.60

30

79.00

51.40

73.53

58.76

54.69

32.80

25

77.50

47.00

68.51

53.84

50.15

28.00

20

76.00

42.60

62.48

48.65

45.46

23.20

15

74.50

38.20

55.19

43.17

40.60

18.40

10

73.00

33.80

46.26

37.41

35.57

13.60

5

71.50

29.40

36.19

31.36

30.37

8.80

0

70.00

25.00

27.33

26.30

26.09

4.00

Sample power cost numbers

Single shift operation / 10 hours per day / 5 days per week / $0.05 per kw

 

HP

Full load power cost

70% load

70% load

70% load

50% load

50% load

50% load

 

 

modulation

On-Line / Off-Line

Econotrol

modulation

On-Line / Off-Line

Econotrol

50

5,759.00

5,241.00

5,478.00

N/A

4,895.00

5,018.00

N/A

75

8,013.00

7,291.83

7,628.38

6,274.18

6,811.05

6,981.73

5,528.97

100

10,776.00

9,806.16

10,258.75

8,437.61

9,159.60

9,389.13

7,435.44

125

13,619.00

12,393.29

12,965.29

10,663.68

11,576.15

11,866.23

9,397.11

150

17,242.00

15,690.22

16,414.38

13,500.49

14,655.70

15,022.95

11,896.98

200

21,758.00

19,799.78

20,713.62

17,036.51

18,494.30

18,957.75

15,013.02

250

27,390.00

24,924.90

26,075.28

21,446.37

23,281.50

23,864.91

18,899.10

300

33,249.00

30,256.59

31,653.05

26,033.97

28,261.65

28,969.85

22,941.81

Variable speed units

 

70% Power Cost

50% Power Cost

 

    

160HP

11,754.60

8,139.30

     

100HP

7,362.00

5,265.00

     

67HP

4,978.00

3,528.00

     

 

Sample power cost numbers

Three shift operation / 24 hours per day / 7 days per week / $0.05 per kw

HP

Full load power cost

70% load

70% load

70% load

50% load

50% load

50% load

 

 

modulation

On-Line / Off-Line

Econotrol

modulation

On-Line / Off-Line

Econotrol

50

19,404.00

17,658.00

18,457.00

N/A

16,493.00

16,907.00

N/A

75

26,997.00

24,567.27

25,701.14

21,138.65

22,947.45

23,522.49

18,627.93

100

36,306.00

33,038.46

34,563.31

28,427.60

30,860.10

31,633.42

25,051.14

125

47,740.00

43,443.40

45,448.48

37,380.42

40,579.00

41,595.86

32,940.60

150

58,093.00

52,864.63

55,304.54

45,486.82

49,379.05

50,616.43

40,084.17

200

73,307.00

66,709.37

69,788.26

57,399.38

62,310.95

63,872.39

50,581.83

250

92,283.00

83,977.53

87,853.42

72,257.59

78,440.55

80,406.18

63,675.27

300

112,025.00

101,942.75

106,647.80

87,715.58

95,221.25

97,607.38

77,297.25

Variable speed units



 

70% Power Cost

50% Power Cost

 

    

160HP

    39,495.46

27,348.05

     

100HP

24,886.00

17,740.00

     

67HP

16,771.00

11,887.00

     

Cost of Air Leaks

Single shift operation / 10 hours per day / 5 days per week / $0.05 per kw

1/4" air leak at 100PSI consumes approximately 104CFM - which comes to a yearly power cost of $2,235.00

1/2" air leak at 100PSI consumes approximately 415CFM - which comes to a yearly power cost of $8,483.00

 

Cost of Air Leaks

Three shift operation / 24 hours per day / 7 days per week / $0.05 per kw

1/4" air leak at 100PSI consumes approximately 104CFM - which comes to a yearly power cost of $7,530.00

1/2" air leak at 100PSI consumes approximately 415CFM - which comes to a yearly power cost of $28,580.00

 

 

Copyright 2002-2008 Air Services Company All Rights Reserved.

Web Design Company